<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Replacement Model for Street Lighting Systems

dc.date.accessioned2023-06-26T12:35:02Z
dc.date.available2023-06-26T12:35:02Z
dc.date.issued2021-03-23
dc.description.abstractReplacing failed bulbs of streetlights in a location can be very tasking and expensive if the optimal time for replacement is not determined. In this paper, a model has been developed that helps to establish the optimal time for the replacement of streetlight bulbs. Burnt-out bulbs are replaced individually when they fail, and group replacement is carried out on all bulbs after a specified time. The costs for both individual replacement and group replacement are determined. The developed model was applied to locally sourced data from a field survey of a streetlight installation at the University of Ilorin, Ilorin, North-central Nigeria. The model gave the optimum replacement time of burnt-out bulbs as the eighteenth week when applied to the data used in this work. The optimum replacement time will be dependent on the dataset used. This makes the developed model useful in establishing the optimal replacement time of any stochastically failing items that are in large quantities. The model will help to reduce maintenance costs for facility managersen_US
dc.identifier.urihttps://uilspace.unilorin.edu.ng/handle/20.500.12484/11326
dc.language.isoenen_US
dc.publisherNigerian Journal of Technology (NIJOTECH)en_US
dc.subjectreplacement model, streetlights, burnt-out bulbs, optimum replacement timeen_US
dc.titleReplacement Model for Street Lighting Systemsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
10. nijotech 2021.pdf
Size:
647.72 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections